We have an approx 1,000tonne that will be cut up for scrap as per photos at Glencore Integra Mine. The work will be ongoing from 22/04/25 until part way through May. The contractors work a 2-1 roster and will move on average 20x (single equivalent) per week from site. Loading will be done via an excavator.
Preference will be for a tonnage rate from site to Newcastle as material is heavy and consistent.
Combination of nominated transport option needs to be identified and legal payload limit for review. Site does not have a weighbridge so trailer weight indicators are preferred.
Successful contractor will need to be onboarded to CMA Contracting, escorted on mine site unless already compliant and work under direction of site supervisor for loading and scrap movements.
Flat tops will also be required (separate advert)