We have an approx 3,000tonne dragline that will be cut up for scrap as per photos at Oaky Creek Mine. The work will be ongoing from 7/04/25 until part way through June. The contractors work a 2-1 roster and will move on average 20x (single equivalent) per week from site. Loading will be done via an excavator.
Preference will be for a tonnage rate from site to Mackay as material is heavy and consistent.
Combination of nominated transport option needs to be identified and legal payload limit for review. Site does not have a weighbridge so trailer weight indicators are preferred.
Successful contractor will need to be onboarded to CMA Contracting, escorted on mine site unless already compliant and work under direction of site supervisor for loading and scrap movements.
Tippers will also be required (separate advert)
Submit your quote now and earn money moving Freight!